top of page
Set up your new BoxPlunge
Box 10 to 19
(READ 1, 2 & 3).
READ the NOTES in between.
wait at least 8 hrs with freezer upright
Unplug before plunging
UNPLUG BEFORE PLUNGING
1
Let it air for 1 hr, there may be a strong odor due to sealant.
Watch this set-up video:
Keep your water PH between 7.2 to 7.6
Learn more
Tip: To speed cooling process disconnect water pump for initial cooling
2
Fill up with water (Use mark for reference). Make sure there is at least 2" of water above pre-filter mesh.
Add 10 or more XL ice-bags the first time you fill it up with water (or be very patient)
Note: Extra draining hose.
Correct plunging position:
NEVER sit on the compressor step!
​​
bottom of page