top of page

Set up your new BoxPlunge

Box 10 to 19

(READ 1, 2 & 3).
READ the NOTES in between.

wait at least 8 hrs with freezer upright 

Unplug before plunging

UNPLUG BEFORE PLUNGING
 

1

Let it air for 1 hr, there may be a strong odor due to sealant.

Watch this set-up video:

Keep your water PH between 7.2 to 7.6
Learn more

Tip: To speed cooling process disconnect water pump for initial cooling

2

 Fill up with water (Use mark for reference). Make sure there is at least 2" of water above pre-filter mesh.

Add 10 or more XL ice-bags the first time you fill it up with water (or be very patient)

Note: Extra draining  hose.

Correct plunging position:

CorrectSittingPositionBoxPlunge.png

NEVER sit on the compressor step!

​​

bottom of page